West Virginia SWPPP inspection requirements
- Rain trigger
- 0.5″ storm event
- Post-rain deadline
- Within 24 hours
- Routine inspections
- Every 7 or 14 days
- Permit
- WV/NPDES Construction Stormwater General Permit
- Agency
- West Virginia Department of Environmental Protection (WVDEP)
Verify against your permit. These values reflect the most common reading of West Virginia's program; permits change and projects vary. The official permit text from WVDEP controls.
How West Virginia handles construction stormwater
Construction sites in West Virginia disturbing one acre or more need coverage under the WV/NPDES Construction Stormwater General Permit, administered by West Virginia Department of Environmental Protection.
Inspector qualifications
A qualified person designated by the operator. Check the current state permit for certification requirements.
Official sources
Common questions
What triggers a SWPPP inspection in West Virginia?
Under the WV/NPDES Construction Stormwater General Permit, a storm event of 0.5 inches or more triggers a post-storm inspection, generally due within 24 hours (non-work days typically extend to the next work day; check your permit). Routine inspections run every 7 or 14 days.
Who can perform SWPPP inspections in West Virginia?
A qualified person designated by the operator. Check the current state permit for certification requirements.
Who administers the construction stormwater program in West Virginia?
West Virginia Department of Environmental Protection (WVDEP) administers the NPDES construction stormwater program in West Virginia under the WV/NPDES Construction Stormwater General Permit.
What are the penalties for SWPPP violations in West Virginia?
Federal Clean Water Act civil penalties can reach $68,445 per day per violation, and WVDEP can issue administrative orders and state penalties on top. Missing rain-triggered inspections is among the most commonly cited violations in stormwater audits.
Free templates & guides
Other states